Serene Lakes Property Owners Association
   
SLPOA Home
Development Home
Development News
Upcoming Events
Chronology
Countdown
SLPOA Documents
DSAA Documents
Foster-Syme Docs
Nevada County Docs
Placer County Docs
SierraWatch Docs
Maps
Links
Pictures
Protest Pictures
Videos
Donations
Search SLPOA
 

 

 

 

 

 

 

 

 

 

Foster-Syme Documents

The following documents have been published by Foster-Syme dealing with the Donner Summit Serene Lakes development project. The format of the document (Word, PDF) and the file size is shown.  Each document will open in a new window.

Draft Documents released by Placer County January 3, 2008

We republish these documents on the SLPOA website in order to reduce the amount of time it takes to download them.  As they are delivered from the Royal Gorge Futures site they have not been compressed. By compressing the files we are able to deliver smaller, in some cases much smaller, files.   While not typical, we were able to reduce the largest file from 139 MB to 29.3 MB. All of the files are PDF files.

 

Document Description Size
Archeological and Historical Investigations Archeological and Historical Investigations, 9/2006. 2 MB
Biological Resources Assessment Cover Letter Biological Resources Assessment Cover Letter to Placer County Community Development Resource Agency, 10/30/2007 967 KB
Biological Resource Assessment (BRA) A Biological Resources Assessment prepared by North Fork Associates for Royal Gorge, September 12, 2006. 11 MB
Development Standards and Design Guidelines Development Standards and Design Guidelines, Pre-Submittal Draft, 11/19/2007. 2.7 MB
Drainage Plan(1) Drainage Plan(1), 11/2007. 4.2 MB
Drainage Plan(2) Drainage Plan(2), 11/2007. 4.4 MB
Drainage Plan(3) Drainage Plan(3), 11/2007. 3.8 MB
Existing Land Use Map Existing Land Use Map. 11/2007. 459 KB
Geotechnical Conditions Report Geotechnical Conditions Report, 9/2006 4.3 MB
Geotechnical Conditions Report Maps Geotechnical Conditions Report Maps, 9/2006 3.8 MB
Geotechnical Conditions Report Maps (cont.) Geotechnical Conditions Report Maps (cont.), 9/2006. 5.1 MB
Land Use Plan Overlay Land Use Plan Overlay, 11/2007. 270 KB
Outreach Results Outreach Results, 8/29/2007 868 KB
Phase 2 Wastewater Treatment and Effluent Disposal Alternatives Study Phase 2 Wastewater Treatment and Effluent Disposal Alternatives Study, 11/2007. 3.1 MB
Phase 2 Wastewater Treatment and Effluent Disposal Alternatives Study Appendices Phase 2 Wastewater Treatment and Effluent Disposal Alternatives Study Appendices, 11/2007 9.6 MB
Phase I Environmental Assessment Phase I Environmental Assessment,  4/19/2005. 29.3 MB
Phase I Environmental Assessment, Appendices Phase I Environmental Assessment, Appendices, 4/19/2005 70.7 MB
Specific Plan Pre-submittal Draft Specific Plan Pre-submittal Draft, 11/21/25007 13.4 MB
Study Area Maps Study Area Maps, 9/2006 12.8 MB
Traffic Impact and Parking Analysis Traffic Impact and Parking Analysis Pre-submittal Draft Report, 11/19/07 6.7 MB
Traffic Report Appendices Traffic Report Appendices, 11/26/07 3.5 MB
Union Pacific Letter Union Pacific Letter regarding Overpass, 3/2/2007 59 KB
Water Supply Alternatives Water Supply Alternatives Pre-submittal Draft Report, 11/8/2007 36 MB
Wetland Delineation Report Appendix A Wetland Delineation Report Appendix A/B, 11/7/2007 10.3 MB
Wetland Delineation Report Appendix C/D Wetland Delineation Report Appendix C/D, 11/7/2007 4 MB

 

Previously Released Documents

 

Document Description
Alternative Water Supplies Overview of potential water supply alternatives dated 5/17/07. A PDF document, 1.3 MB.
Royal Gorge Biological Resource Assessment (BRA) A Biological Resources Assessment prepared by North Fork Associates for Royal Gorge, September 12, 2006. A PDF document, 12.6MB.
Estimated Water Demand Estimate of Water Demand dated 5/17/07. A PDF document, 77 KB.
MAPF Letter proposing meetings A letter from Royal Gorge to interested parties proposing facilitated discussions. A PDF document, 65 KB.
Peer Review of Biological Baseline Conditions A peer review of two documents describing biological baseline conditions for the approximately 2,896-acre Royal Gorge study area. A PDF document, 60KB.
Project Description Project description prepared by Royal Gorge, June 5, 2007. A PDF document, 901 KB.
Public Input Report, August, 2006 Foster-Syme present the results of their Public Input process. A PDF document, 149 KB.
Public Input Report re: SLPOA Leadership Foster-Syme take a shot at SLPOA leadership, not the best way to win friends...
Public Input Report, May, 2007 Foster-Syme present the results of public comment after their community presentations.
Royal Gorge "Misconceptions" article An article by Mike Livak presenting Royal Gorge's concerns over misconceptions in SLPOA's July Newsletter item. A PDF document, 149 KB.
Royal Gorge letter following March 2007 meeting A letter from Mssrs. Foster, Syme and Livak regarding the discussions with SLPOA on March 24, 2007.  A PDF document, 51 KB.
Transmittal letter for Water Demand and Alternative Supply memos A transmittal letter to SLCWD describing and summarizing the Water Demand and Alternative supply studies, dated 5/17/07. A PDF file, 68 KB.
Water Issues article An article discussing the use of Serene Lakes as the Royal Gorge water supply dated June 7, 2007.  A PDF document, 418 KB.
Wetlands Delineation Study A Wetlands Delineation Study prepared by North Fork Associates for Royal Gorge, September 25, 2006. A PDF document, 16MB.
   
  Copyright Serene Lakes Property Owners Association, 2007  Terms of Use